OCT., 1987Headquarters established with 34,000,000 JPY in Yasu City, Shiga prefecture.
Tokyo branch established.
Hirofumi Ono named representative director.
JAN., 1988MM-10 and 20 series mass flow meter release.
MAR., 1988MC -100 and 200 series mass flow controller release.
NOV., 1989Capital increased to 50,000,000 JPY.
LC-1000 liquid mass flow controller release.
JUN., 1990MC-1000M series mass flow controller release.
DEC., 1991MC-2000 series digital mass flow controller release.
DEC., 1992MM-2000 series digital mass flow meter release.
DEC., 1993LV-1100 and AV-1100 liquid vaporizer unit release.
DEC., 1996LM-2100 digital liquid mass flow meter release.
OCT., 1997LSS-1000 automatic liquid supply system (TEOS) release.
APR., 1998Yoritaka Isoda appointed as representative director.
Hirofumi Ono named board chairman.
AUG., 1998Capital increased to 99,950,000 JPY.
SEP., 1999VU-510 vaporizer unit for CVD release.
FEB., 2000MC-3000E series compact size mass flow controller release.
AUG., 2001Capital increased to 174,870,000 JPY.
NOV., 2001ISO 9001 license obtained.
MAR., 2002MC-5000 series Device Net mass flow controller release.
OCT., 2002HX-10 and HX-101 high-performance heat exchanger release.
DEC., 2003AM-3000 mass flow meter for strong acid applications release.
JAN., 2004VU-T450 and T550 premix vaporizer release.
MAY., 2005New factory established in Otsu city, Shiga prefecture.
Headquarters relocated to Otsu city.
DEC., 2006VU-910 low-temperature, high performance vaporizer release
JUN., 2008ISO 14001 license obtained
JUL., 2008MC-3000L series high-accuracy mass flow controller release.
JUN., 2009LC -3000L series liquid mass flow controller release.
DEC., 2011MC-5000C series EtherCAT mass flow controller release.
MAY., 2012JP LINTEC manufacturing subsidiary established.
DEC., 2012MC-700 series variable-range mass flow controller release.
DEC., 2014MC-10 series mass flow controller released.
MAY., 2016New Malaysia factory (JP LINTEC) established in Pulau Pinang.
DEC., 2016QV-1000 series quartz vaporizer release.
OCT., 2018Capital decreased to 98,000,000 JPY.
NOV., 2021LINTEC Holdings established.
DEC., 2021New factory established in Otsu city, Shiga prefecture.